FREE SHIPPING FOR ALL ORDERS OF $150
Vesgantti Twin Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Single Matt

Vesgantti Twin Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Single Matt

USD 190.18 USD
SKU: PvQjXr2n
Brand: Vesgantti
GTIN: 7445050523537
Condition: New
Categories: Home & Garden

Specifications

BrandVesgantti
Age Range DescriptionAdults Kids
Style10 inch
Item Dimensions75 x 39 x 10.2 inches
Item Dimensions L X W X Thickness75"L x 39"W x 10"Th
Mattress Comfort Layer MaterialMemory foam
Item Firmness DescriptionMedium
Brand NameVesgantti
Item Depth10 inches
Model Numbertwin mattress
Top StyleEuro Top
Number Of Mattress Coils350
Model Nametwin mattress
ManufacturerVesgantti
Material TypeMemory Foam
Item Weight50 Pounds
Fill MaterialMemory Foam
Construction TypeHybrid
Mattress Coil TypePocketed Coil
PortableYes
ColorBlack and White
Cover Materialknitted fabric
Top-styleEuro Top
Style Name10 inch
Included Componentsmattresses
Product Dimensions75"L x 39"W x 10"Th
Product Care InstructionsHand Wash Only
UPC7445050523537

Manufacturer Vesgantti. Compare with Vesgantti Mattress. Model Number twin mattress. Number of Mattress Coils 350. Mattress Coil Type Pocketed Coil. Smaller size, easy to carry. Construction Type Hybrid.

Related Items

Carrito
Sidebar