Vesgantti Twin Mattress, 12 Inch Memory Foam Hybrid Mattress in a Box with Indiv
USD 140.13 USD
Specifications
| Brand | Vesgantti |
| Age Range Description | Adult |
| Style | 12 Inch |
| Item Dimensions | 75 x 39 x 12 inches |
| Item Dimensions L X W X Thickness | 75"L x 39"W x 12"Th |
| Material Type | Memory Foam, Coils |
| Mattress Comfort Layer Material | Memory foam |
| Item Firmness Description | Medium Firm |
| Brand Name | Vesgantti |
| Item Depth | 12 inches |
| Top Style | Euro Top |
| Number Of Mattress Coils | 200 |
| Model Name | Vesgantti |
| Additional Features | Vacuums |
| Manufacturer | Vesgantti |
| Item Weight | 26.58 Kilograms |
| Fill Material | Memory Foam |
| Construction Type | Hybrid |
| Mattress Coil Type | Pocketed Coil |
| Special Feature | Vacuums |
| Color | White |
| Cover Material | Polyester Blend |
| Top-style | Euro Top |
| Product Dimensions | 75"L x 39"W x 12"Th |
| Style Name | 12 Inch |
| UPC | 7445011981925 |
Manufacturer Vesgantti. 【Mattress-in-a-Box】- For your convenience, Vesgantti mattress is compressed rolled, and you can easily move it and set it up in your room. Our mattress is suited for foundation beds, bunk beds, guest beds and floor.